Aerospace Engineer Resume
4.00/5 (Submit Your Rating)
Los Angeles, CA
OBJECTIVE
- To contribute to any Aerospace A leader in Design, Manufacturing of the Aircrafts / Spacecraft’s and Systems.
SKILLS SUMMARY
- MRB for Commercial / Military Aircraft Structures & Systems;
- MBD - Model Base Definition in CATIA V5/V6 & ENOVIA LCA - Life Cycle Applications (10 000 hrs.),
- CATIA V4 PDM-Product Data Manager; VPM-Virtual Product Manager&TeamCenter PLM (10 000 hrs.)
- Aerodynamically Optimal Shapes of Aircraft’s / Spacecraft’s, and Fluid Mechanics;
- Primary & Secondary Structural Design & Build Management (BOM-Bill Of Materials).
- FAA (FAR's), EASA, DOT Regulations & Compliances; FCc- Flight Configuration Changes
- Production Support B747-8F/-8I, Return to Engineering Drawing Configuration after Flight Test Certification (FAA);
- Aerospace Project Plans & Tech. Documentation; Product Teardown in Reverse Engineering
- Geometric Tolerancing & Dimensioning (GT&D); Standards ANSI Y.14.5M-1994, ASTM MIL.
PROFESSIONAL EXPERIENCE
Aerospace Engineer
Confidential, Los Angeles, CA
Responsibilities:
- Adjustment Act and Managed by Employment Development Department
- Key aspects of Spacecraft Vehicle Design, and Engineering with structural considerations, Propulsion, Opto-
- Mechanical and Laser Design Engineering, Orbital Mechanics, Attitude Dynamics & Control, communication systems, electrical Power, and Thermal Management of Spacecraft’s.
Aerospace Design Engineer
Confidential, Garden Grove, CA
Responsibilities:
- Galleys’ Design / Modification/Approvals in Technical Proposals for Boeing B737MAX, B777X Commercial Airplanes concerning the safety of passenger in the cabin was introduced
- The Galleys with Airbags, go keep safety in situation of Emergency during the all flight envelope, according with FAA, EASA, ICAO Safety regulations
Aerospace Structural Design Engineer
Confidential, Everett, WA
Responsibilities:
- B777 Freighter Project, Design Engineer Lead: Conversion the B777-200LR(Long Range) to B777 Freighter;
- B777 AFG- DA (Accurate Floor Grid) DA-(Determination Assembly) Project: Got Boeing's Award in Recognition Appreciation for Special effort as Design Engineer Lead to in corporate AFG-Accurate Floor Grid (DA)-Determination
- B787-8 Dreamliner Program: Got Boeing’s Award for Release 15 CI's(Change Instructions) for stretched version B787-9
- B747-8 (F-Freighter & I-Intercontinental); Got Boeing’s Award for Reduction B747-8 as Design Engineer Lead for the
- CAR's- (Corrective Action Requirements) Improve backlog from Over 100 CARs down to 15 CARs in short amount of time in Production of the 747-8. Design Engineer (DE) Lead, Sign Off Authority for FCc- Flight Configuration Changes in Production Support B747-8F/-8I, Return to Engineering Drawing Configuration after Flight Test Certification (FAA).
- Got Boeing’s IT Accounts: CATIAV4/V5, ENOVIA V5/V6, ECAS/IBEX, REDARS, DCAC, STAC, and PDM & IVT.
- Research, Develops Turbo-Fuels Systems to allow Airplane's Safety FlightsPh. D Thesis in Turbo-Fuels Systems.
Senior Airframe Design Engineer
Confidential, Kichita, KS
Responsibilities:
- Design/Approval during the execution of ECR-Engineering Change Request in Production Support of HORIZON H4000 According with the ROBB report 2008 year "The Best of the Best" Business Jet fully in Composites with CATIA V4/VPM
Aerospace Design Engineer
Confidential, Everett, WA
Responsibilities:
- Project B777 - AFG (Accurate Floor Grid) DA (Determination Assembly). Apply 3D & 2D models (CATIA V4) to Design and Approval Parts/Assembly: Seat Tracks, Floor Channels, Beams, Intercostal.
- Project for B787-8 Dreamliner Program; Large Cargo Door (LCD) in Composites; Created 3D-MBD (Model Base Definition) & 2D Drawings, instructions, specifications and documentation for Parts/ASSY: Beams, Seal Retainers, Pressurized blades, Strappers, Fillers, Spars, Supports, and Fittings.
- Project to install General Electric (GenEnx) & Rolls Royce (Trent 1000) onto B787-8 Dreamliner Airplane. Worked with LCPT (Life Cycle Product Team) after Pylon, Nacelles & Trust Reverser. Design / Approve Structural Parts/ASSY: Spar Web, Fittings, Stiffeners, Washers, and Die & High Cycle Fatigue Specimens.
- American Airlines (AA) Project; Design for Approval the Blended Fitted Winglets for the B737& B767 Airplanes. * Conduct analysis in Review Design/Drawings, specifications for Wing / Winglets in 3D (MBD) for B737 & B767