Site Engineer Resume
0/5 (Submit Your Rating)
SUMMARY:
- In depth understanding and expertise in electrical system designing and Support & maintenance operations of a wide range of instruments/equipments/systems.
- Demonstrating technical proficiency in a high paced environment & exercise judgment within defined procedures & practices to determine appropriate action.
- A systematic, organized, hardworking team builder with an analytical bent of mind; reliable as a fully contributing, responsible & accountable member of task/project teams.
- Excellent relationship management skills & ability to conceive efficient solutions utilizing technology.
- Erection of cable tray, cable laying, cable glanding &termination(LT & HT), panels.
- Study of Layout Drawings, Power & Control circuit drawings & Modifications done if required following specific Standards for code of Practice.
- Accountable for system interface with electrical system.
- Accountable for erection, commissioning, operation & maintenance of LT motors(up - to 200KW)& HT motor(up-to 300KW )
- Experience in erection, commissioning&maintenance of indoor type of switchgear (up to 11KV) including bus duct.
- Having experience in erection& commissioning of transformer (wet & dry) up to 2.5MVA.
- Experience in Motor overhauling (LT).
- Erection, commissioning, maintenance of battery bank (dry as well as wet cell), UPS (up to 20KVA).
- Erection of PMCC, MCC panels, DCDB, ACDB, Junction boxes.
- Erection, Commissioning, maintenance & trouble shooting of PLCsystem (GEFANUC: 90-30 series, 90-70 series, RX3i series; SCHEIDER, ABB).
- Experience in Earthing system for Electrical System.
- Erection, Commissioning &trouble shooting of C&I instruments like Pressure Gauges, Pressure Switches, Solenoid Valves,Level switches,Transmitters, RTD’s, Installation of SS Tubing & Impulse Piping, Instrument Boxes with Manifold Installation.
- Preparing of Method Statement for Instrument Calibration & Electrical Activities.
- Scheduling and execution of preventive,running & breakdown maintenances.
- Actively involved in cost effective procurement of spares.
- Accountable for raising invoice, making payment to contractors & communicating with the clients.
- Actively coordinate with engineering, vendors, and project management department for execution of project.
- Responsible for overall administration &technical for a package in a power plant.
- Dealt with safety norms, labor laws at site.
- Experience in making Purchase orders for vendors.
- Ensuring proper cash flow statement, recovering payments from Clients and controlling finance at site.
PROFESSIONAL EXPERIENCE:
Site Engineer
Confidential
Responsibilities:
- Worked as Site Engineer (E & I), It includes complete erection, commissioning of electrical /C & I equipments (LT switchgear,panels,motors,transformer,PLC) related to Ash handling Plant. Responsible for handling of subcontractors, making of progress reports, coordination with engineering team, study of layouts, power circuits & control circuit modifications if required, attending punch points, reconciliation, protocol making, system handover. Attending periodic technical meetings with vendors & clients, timely completion of job on target dates.
- Presently Job includes maintenance of electrical equipment’s in Ash handling Plant (2x600MW) completely. Attending meetings, day to day reporting to package head (client side). Coordination, monitoring & controlling of individual departments, subcontractors, developing local vendors. Responsible for client billing, fund requirement reports, cash flow reports, complete site administration through ERP system.
Construction Engineer
Confidential
Responsibilities:
- Worked as Project Engineer, electrical in Ash handling Plant (vacuum system, dense phase system, HCSD system, Slurry disposal system, and Bottom Ash wet type).It includes post commissioning activities of the system, system interface as per operation requirement,attending punch points,system modification for betterment of process.
Electrical Engineer
Confidential
Responsibilities:
- Worked as Engineerin Ash Handling Plant.It includes complete erection,testing & commissioning of HT, LT switchgear,transformers,motors(LT& HT),lighting panels, earthing system.Responsible for erection & commissioning of PLC system,system interface,interface with switchgear.Daily reporting to immediate senior and timely completion of job on target dates.
Confidential
Responsibilities:
- Worked as Asst. Engineer (Electrical)in lime stone handling Plant. It includes erection of panels, Junction boxes, cable laying, and terminations.