Sap Resume
New Jersy, NJ
Professional Summary :
- Total 15 years of IT experience in Technical leadership in SAP in Installation/Upgrade/OS/DB Migration of R/3 and ECC6 EHP5. Implemented/worked on Netweaver 2004s Products - BI 7, CRM, SRM, SCM 5, Enterprise Portal 7, R/3 Enterprise 4.7 X 100, Solution Manager & BW 3.1 Content and also completed 5 full life cycles Implementation.
- Creating the future road maps for SAP product implementation.
- Server sizing, Server Procurement and working with hardware vendor for calculating number of SAPS per server
- Design, configure and administer SAP system landscape.
- Define technical policies and procedures.
- Meet with business to understand the requirements and delivering the technical solution.
- Design of client strategy for Development, Quality Assurance (QA) and Production environment.
- Design SAP Transport Strategy for system landscape.
- Designing backup & restore policy.
- Oracle Installation and upgrade.
- Planning Disaster Recovery for Site Redundancy.
Professional Training Attended
- SAP ECC6 EHP5 upgrade - SAP America, Philadelphia, PA
- SAP Netweaver Portal 7 Administration - SAP America, Philadelphia, PA
- Local Area Network (LAN) Engineering – Mumbai, India
- Cisco Certificate – Mumbai, India
Confidential, RI November 2007 – July 2012
Roles: SAP Basis Team Lead
- Implemented/designed and architected ECC 6 EHP5 upgrade.
- Build, design as well implementation SAP security roles and profiles for SAP landscape.
- Implementation and upgrade of BW landscape to BI 7.
- Access Control and Segregation of Duty (SoD) for yearly SAP audits.
- Implementation of SAP Portal and SAP Business Planning and Consolidation (BPC)
- Implementation of Single-Sign-On in SAP Netweaver Portal 7 integrated with Active Directory.
- Implementation of business packages for ESS and MSS for HR System in SAP Portal 7.
- Design and architect for SAP Disaster Recovery (DR) Servers solution with oracle 11G without using third party software by providing a cost effective solutions.
- Owned IS annual controls and audit compliance for Sarbanes-Oxley, and ISO 27001.
- This lead to an improved business stakeholder relationship with increased accuracy and time ultimately saving a huge cost to the corporation.
- Refresh of Database by performing backup and recovery of database on SAP quality and sandbox system.
- Lead a team in identifying project risk and to develop a mitigation plan.
- Architect for OS/Database migration project and design of future landscape on Linux environment for SAP.
- Upgrade of Oracle 10G to 11G.
- Monitor and maintain SAP systems environments for optimum performance and be proactive in identifying potential problems.
- Support on call basis.
- Create adequate balance between the team members for daily support and project activities.
- Responsible for SAP Audit and SAP security.
- SAP data archiving.
- Responsible for negotiations of OS, Database, Backup, ERP-SAP with vendors
SAP Environment: ECC6 EHP5, R/3 Enterpice, BI 7, Netweaver Enterprice Portal 7
OS: Windows and Linux 5
Database: Oracle 11G and 10G
Confidential, April 2004 – October 2007
Project: Upgrade from R/3 4.7 systems to ECC 5.0 for client - Freescale semi-conductor, division of Motorola – Tempe, AZ
Key Role: Basis Lead/Architect for Upgrade from R/3 4.7 systems to ECC 5.0
Project scope includes following activities:
- Oracle upgraded from 9.2.7 to Oracle 10G
- SPAM update to latest version
- Apply support patches for avoiding the upgrades error.
- Prepared Landscape Upgrade Plan for R/3.
- Activate participate in the mock cut over, for the timely delivery production server upgrade.
- Carried out environment check list for all the servers before handing over the system.
- Delivery of Upgraded Production system on time.
- Project report submitted to internal audit team of review.
SAP Environnent: SAP : ECC 5, BW 3.5,
OS : AIX 5.5,
Database : DB2, Oracle 10G
Projects: BW upgrade from 3.0 B to 3.1 Contents
Key Role: Basis Team Lead
The project scope includes following activities:
- Study of BW existing system i.e 3.0B and documentation.
- Apply support patches for avoiding the upgrades error.
- Upgrade Training Server.
- Activate participate in the mock cut over, for the timely delivery Production Support Server upgrade.
- Carried out Environment check list for all the servers before handing over the system.
- Upgrade of production system
- Project report submitted to team for review.
SAP Environnent: SAP : BW 3.1 Contents,
OS : AIX 5.5,
Database : DB2
Projects: SAP Security
Role: Technical Team Lead
The project scope includes following activities:
- Creation of documentation for SOX Compliance.
- Understands Impact to Baseline Business Requirements
- Follow pre-defined process set by client to create personnel Actions form in BW Report
- Preparation of SAP Security evidence/documentation for audit.
- Developed CATT Procedure for User id creation / Role assignment
- User id and Role assignment for Production system through client (Dyno or ITHelp) Ticketing system for SRM.
- Participate in Annual Review: Access Review and Validity Review of all user accounts.
- User id creation and Role assignment for production system
- Segregation of Duties (SOD) reports creation and documentation.
SAP Environnent: BW 3.5, SRM, CRM, ECC 5.0
OS : AIX 5.5,
Database : DB2 & Oracle 9.2.7
Confidential,Houston, TX
Key Roles:
- Migration of Old BW 3.0b roles to New Analysis Role of BI 7.
- Preparation of Landscape Security Migration plan.
- Mock & Production Cut over plan.
- Design of New role for the current development activities.
- Involved and Implemented the Netweaver Security
- Involved in implementation of Analysis Authorizations in BI (Netweaver)
- Activated Authorizations in BI and managed hierarchical Authorizations
- Designed and developed the BW security model on the basis of functional area level.
- Extensively worked in SAP BW, Data modeling, Reporting and BW security.
- Developed security models with inputs from Functional & Technical teams using tools in PFCG and SUIM
- Created, modified, and assigned user authorizations and profiles to user IDs.
- Go-live support.
SAP Environnent: BI 7
OS : Linux 5
Database : Oracle 9.2.7
Projects: Disaster Recovery for R/3 4.7 and BW 3.1 C
Role: Technical Team Lead Basis/Abap
The project scope includes following activities:
- Developing a Disaster Communication Responsibilities plan.
- Preparing SAP Operation Disaster Communication Process Flow chart.
- Validate if any additional Incident Communication Process to be conducted.
- OS/390 Operating System Recovery
- R/3 DB2 Database Recovery
- Vertex(TAX Software) Install
- KPRO Recovery
- Preparation of critical Application Recovery/Validation.
- Creating Critical Application Fail-back plan.
- SAP BW CI in USS Disaster Recovery
- BW DB2 Database Recovery
- Maintaining the Disaster Recovery Plan
- Off-Site Storage of the Disaster Recovery tapes
- Electronic Storage of the Disaster Recovery Plan
- Distribution of the Disaster Recovery Plan
- Documenting
- SAP R/3 Critical Interface Recovery process.
SAP Environnent: BW 3.5, ECC 5.0
OS : Main frame – ZOS
Database : DB2
Project: OS/DB Migration to Mainframe ZOS
Role: Basis/ABAP Team Lead
The project scope includes following activities:
- Create Linux Environment
- Install DB2 Connect
- Install Central Instance
- Configure DB2 Connect
- Configure Vertex (Tax Software)
- Create Tivoli Alerts
- Identify Userids / Groups
- Configuration of Rightfax (Fax Software)
- Installation of Connect: Direct for Idoc and file transfer.
- Installation of Maestro for Job Schedule
- Installation of Sapia
- Configure ITS
- Configuration of WWI Server
- SMLG configuration
- Configure AutoCTS
- File transfers (need C: D)
- Lotus Notes interface
- STMS Configuration
- Update Print Spool Servers
- DNS Configuration (Change alias names to point to new server)
SAP Environnent: SAP : BW 3.5, CRM / ECC 5.0
OS : Main frame – ZOS
Database : DB2
Project: Enterprise Portal (EP 6 SP 2)
Role: Basis Team Leader
The project scope includes following activities:
- Study of Existing EP 6 SP2 at LNT and documented the process flow.
- EP 6 on .Win 2K SP4 , implemented domain controller for EP6 pre-requisite configuration.
- Implemented EP System Database
- Install SQL Server on Win 2K
- DB Schemas on Windows
- Portal , Content Management & Collaboration
- Installing the Portal Platform, CM, and Collaboration
- Install SAP J2EE System for Portal Cluster
SAP Environment: EP 6 SP2,
OS: Win 2000
Database: MSSQL
Project Role: Confidential,Banglore, India
Key Roles:
- Upgrade of current BW 3.0B system to latest version of Netweaver 2004s – BI 7.
- Implementation of XI
- Present cost benefit solutions.
- DB Connect from Non SAP product to Netweaver 2004s – BI
- Data load strategy for BI 7
- DBConnect from MY SQL to BI 7
- Aggregates & Indexes for Query Performance.
- Configuration of WebAs for Web Reporting
- Written a Case Study for OS/DB Migration & DBConnect
- Design of Security based on Info-Cubes, Hierarchy (Sale Office & Customer)
- Implementation on Report base Security.
- Design Roles and Authorization Matrix.
- Implementation of SOD, base on Zone Wise and Plant wise.
- In most case, used New Netweaver Security Features called, RSECADMIN for Role Development instead of PFCG.
- Worked closely with BI Designers in creating appropriate authorization Object.
- Instituted a formal process to support modifications and transport of security roles.
- Developed a profile to monitor BI activities without Master and Transaction Data visible to the BI consultant.
- Conducted a Security Training for Functional and Basis Consultant.
- Created Documentation & Procedural work flow for Authorization & Role Creation.
SAP Environment: Netweaver 2004s – BI 7.03, PI 7,
OS: HP UX 11.23
Database: Oracle 10G
Confidential,Mumbai, India August 2001 – June 2004
Key Roles:
- SAP Basis-Network-Security Administrator
- Creating the future road maps for SAP product implementation.
- Server sizing, Server Procurement and working with hardware vendor for calculating number of SAPS per server
- Design, configure and administer SAP system landscape.
- Define technical policies and procedures.
- Meet with business to understand the requirements and delivering the technical solution.
- Design of client strategy for Development, Quality Assurance (QA) and Production environment.
- Design SAP Transport Strategy for system landscape.
- Designing backup & restore policy.
- Oracle Installation and upgrade.
- Planning Disaster Recovery for Site Redundancy.
- Bandwidth requirement finalization and network security
- Clustering of Server in fail-over option.
- Design of backup & restore policy, planning for site redundancy
- Administration Workshops for team members on daily, weekly, monthly basis
- Configured remote backup for SAP Development Server on the Unix System
- Hosting of website on Intranet on Linux environment.
SAP Environnent: BW 3.0B, R/3 4.7
OS: Unix & NT,
Database : Oracle 8.1.7
Confidential,India May 2000 to April 2001
Key Roles:
- Network Engineer
- Delivered reliable performance through intensive collaboration with vendors including Cisco and Microsoft.
- Managed Microsoft vendor contract for enterprise licensing agreement.
- Brought uptime to 99% plus with application of network monitoring tools and training for help Desk, vendors and consulting teams.
- Led technology configurations to support business expansion project, meeting with users and facilities management to design all network access points.
Confidential, India Aug 1995 to Mar 2000
Key Roles:
- Desktop/hardware support
- Back office support as well visiting the clients for (Local Area Network (LAN) Installation
- Responsible for installation of operating system.
- Help desktop activities and call log monitoring.
Education
- Masters of Information System