Agile Program Manager Resume
Orlando, FL
SUMMARY
- Project Manager/Program Manager/Agile Coach with 12 years’ experience and proficiency in functional and technical knowledge and a firm grip on MSPS projects with core problem solving and analytical skills, taking initiatives and understanding and fulfilling the client’s requirements (and business needs).
- Experience in Scheduling management consisting of activity definition and sequencing, resource estimation, duration estimation, schedule development and control activities.
- Experience in Integration management consisting of project plan development, project plan execution, and integrated change control activities.
- Experience in Scope management consisting of project initiation, scope planning, scope definition, and scope control change activities.
- Experience in Human resource management consisting of organizational planning, project team acquisition and staff development activities.
- Experience in Risk management consisting of risk management planning and risk identification with response planning and monitoring activities.
- Experience in Communication management consisting of communications planning, information distribution, Business process and performance reporting and stakeholder communications management activities.
- Experience in Software Development Life Cycle Business process with proficiency in Waterfall and Spiral methodologies, and Agile Scrum and Kanban, ASAP (SD, MM, PP, FI, OTC, P2P)).
- Experience in liaising with business and technical stakeholders, Stakeholder Management, and SMEs.
- Experience as a Project manager in SAP (SD, MM, PP, FI, OTC, P2P)) retail industry with project portfolio management in ECC and EWM.
- Experience as a certified Scrum Master, with understanding of User Stories, velocity, and burn - down charts. Experience as a Scrum Master/BA working on Kanban Board and Business process workflow monitoring.
- Excellent business writing skills in terms of documenting and business requirements (ANALYSIS and business needs)document (BRD), Functional Requirements (ANALYSIS and business needs) document (FRD), Non-Functional Requirements (ANALYSIS and business needs) Document (NFRD), Use Case Requirement Specification (URS), and System Requirement Specifications (SRS).
- Experience in Feasibility analysis, GAP analysis,Impact analysis, Cost Benefit Analysis, Root Cause analysis.
- Experience in SAP Hana (POS)Migration and NS2 set up coordination.
- Experience in SAP Archiving and Testing tool SOLMAN setup/BPA
- Experience in conducting Joint Application Development (JAD) sessions with end users, SMEs, DEVOPS leads and stakeholders.
- In Depth understanding of the AS-IS and TO-BE business processes and experience in converting these requirements (ANALYSIS and business needs) into technical specifications for preparing continuous integration and regression test plans, in a TDD, SCADA culture.
- Technical design and solution continuous integration and regression Test Cases and Test Plans, in a TDD, SCADA culture for Functional and Non-Functional testing, with provisions of planned UAT.
- Experience in SQL queries/scripts for Data and its conversions analysis including triggers procedures in CICD environment.
- Simplified existing applications & integration architecture & build for scalability utilizing SOA as the framework.
- Experience in identifying the Data and its conversions requirements (ANALYSIS and business needs), preparing Data and its conversions flow diagrams, Data and its conversions analysis and Data and its conversions mapping, Business process mapping and BPM with coordination with project manager to create work schedules, deadlines, resources and project tasks using MS project in CICD environement.
- Extensive Knowledge of Financial Analysis (oracle, data, healthcare) Forecasting, Valuation illustrations, Planning, and Budgeting.
- Involved in Project Management activities like defining / managing project scope, schedule management, creating project plans, tracking and communicating project status and deliverables.
- Strong analysis and communication skills with an ability to transform the needs of stakeholders into Functional/Technical requirements (ANALYSIS and business needs), and eventually into Business Logics, Validations, and System Specifications.
- Experience in identifying Key Performance Indicators (KPI), Enterprise Risk Management, and Change Management.
- An inspiring leader and a team player in terms of keeping the team motivated to work in a motivated environment
- Experience Confidential conducting user training and preparing deployment plans for DEVOPS teams.
TECHNICAL SKILLS
Modelling Tools: HPALM, UML, MS Visio, Rational RequisitePro, Mockup Software (Balsamiq and MS-Paint), Rational Rose, SAP (SD, MM, PP, FI, OTC, P2P)) project management.
Methodologies / Frameworks: Agile-Scrum, SAFe, Kanban, SDLC, Waterfall, DMAIC, ASAP (SD, MM, PP, FI, OTC, P2P)).
Data and its conversionsbase: MS SQL Server 2012/2008/2005, MS Access, RDBMS, SAP (SD, MM, PP, FI, OTC, P2P)) backdoor.
Web Technologies: HTML, CSS, JavaScript, XML, Java, Java Script, ASP.Net, C#, AJAX, Web Services, oracle.
Languages: HTML, XML, JAVA, UML.
BI Reporting Tools: Tableau, Crystal Reports, IBM Cognos 10 (report & Query studio), SQL Server Integration Services (SSIS), SQL Server Reporting Services (SSRS), Jenkins, Solar wind logs and event manager, panaya, GIT, Docker, Puppet, Bamboo.
ETL Tools: SQL Server (Business use cases referencing), Tableau, Toad.
QA Testing Tools: HP ALM, JIRA, Confluence, Load Runner, MS Test Manager 2013, Asana, Rally, SOLMAN
Business use cases Tools: MS Office Suite, SharePoint 2010/2013, Version One, TFS.
Healthcare and Finance: MEDI care, ESRD, ESRD organizations (facilities, networks and Confidential Support), Confidential Regulations, ESRD aspects (including Coverages, Claims, Insurance, Transplants, Dialysis and Terminations), Confidential 508 standards, HIPAA, ICD-9, ICD-10, Securities, Derivatives, Bonds, Mutual Funds, ERP, Equities, KPI’s, Pricing, Brokerage, Stocks, Bloomberg Data and its conversions, CRM, FINRA, Swift Payments, Chips, Fedwire, GxP.
PROFESSIONAL EXPERIENCE
Confidential, Indiana
Project Manager/Program Manager/Agile Coach
Responsibilities:
- Responsible for coordinating with director of IT and Architecture to come up with a roadmap plan for the year 2019 and 2020 and build a visual graph of the projects towards Hana (POS)(SD, MM, PP, FI, OTC, P2P).
- Responsible for leading the Blueprint documentation workshops for SAP Archiving project whose main motivation was to reduce the DB size and in turn reduce the total dollar amount value for the HANA (POS)Migration.
- Responsible for ensuring the goal Saving analysis reaches 1 TB DB size from 8TB.
- Responsible for leading the blueprint documentation workshops for SAP SOLMAN project whose main motivation was to create a test suite and test process for the business and replace HPQC. Lead the process of the system testing one - to - one for SAP HANA (POS)migration with the help of the test suite estabilished.
- Responsible for coordination of the 10 manual test cases and set up of demo for the same to promote automation enterprise wide.
- Responsible for Process Orchestration project and coordination of EDI interfaces in SAP so that all the EDI interfaces are switch over to more flexible PO system and so that transport layer has an easy coordination within Service NOW.
- Responsible for Sprint 1,2,3 for 220 interfaces to be migrated from EDI to PO.
- Responsible for Blueprint sessions entailing the details of SAP NS2 set up with the vendor SAP.
- Responsible for leading the access management with Security teams coordination so that vendor access in the system can be managed effectively.
- Responsible for Content Server Management roadmap creation with the Architecture team so that SAP Hana (POS)migration plan can be effectively managed.
- Responsible for change management coordination within Service Now tool with coordination from SAP and Non SAP teams.
- Responsible for Sharepoint Approval process workflow with the business teams so that the projects UAT can be approved.
- Responsible for coordination with the Microsoft and the Linux teams for the server DMO builds for NS2 project set up and Hana (POS)Migration.
- Responsible for Patch Management integration with SAP NS2 for SAP Hana (POS)migration.
- Responsible for Ticketing system integration with Service Now and SOLMAN for the Patch Management process hypercare.
- Responsible for Change Request process set up between SAP NS2 and Allison for the normal and emergency changes.
- Responsible for SAP GUI Jumpstart coordination, CIDR block refinements, Environment set up coordination with SAP NS2 for the SAP HANA (POS)migration.
- Responsible for coordination of connectivity set up with integration from ATT NETBONDs and internal system improvements of SDWAN.
- Responsible for coordination with provisioning monitoring, logs etc. with SAP NS2 team so that so that Sandbox and Development systems can be established for the SAP HANA (POS)migration.
- Responsible for coordination of the test management plan with SAP NS2 team so that the hardening of the systems can be accomplished with 0 test errors occurring before migrating to cloud.
- Responsible for developing via coordination from SAP NS2 team to create handover documentation for post build validation.
- Responsible as the Agile coach/program manager to serve the teams with knowledge on how to function iteratively on projects and bring together a 5 year mapped program for the SAP migration.
Environment: Scrum, Waterfall, Hybrid, SharePoint, Service Now, SOLMAN, Open Text MS Office Suite (Word, PowerPoint, Excel, Outlook), MS Project, Visio, RDBMS, UML, Microsoft Project, Oracle, HPALM, MS Excel, MS Access, SQL Server, JIRA, CONFLUENCE, Java platform, Jenkins Dev ops, Version one Dev ops, SSIS, Javascript, SharePoint, GIT, Docker, Puppet, Bamboo, AMS.
Confidential, Atlanta
Project Manager/Program Manager
Responsibilities:
- Responsible for coordinating with senior management and the stakeholders to create time allocations for each high level deliverable is documented and scheduled in SAFe Orientation and also for recognizing and updating the MSPS schedule to both business, technical and DEVOPS teams by identifying different impacted applications.
- Responsible for conducting EDI and claims elicitations and gathering requirements (SCADA business needs) with multiple clients and then accordingly analyzing and converting high level requirements (SCADA and business needs) into business requirements (SCADA business needs) and for e for Creating and updating the EDI MEDI caid Communications plan for all project stakeholders and including the stakeholders contact lists and distribution structure in order to maintain competence.
- Responsible for creating and updating the MEDI caid Risk management plan for server data repository by identifying and prioritizing the risks and monitoring them carefully through to avoid any negative impacts in the project and also for creating government guidelines and policies to adhere with for the project and interact with Senior business analysis team to monitor the project.
- Responsible for interacting with EDI tech-dev teams and ensuring that server configurations and environments are ready for the project schedule for a DEVOPS CICD environment to begin in SAFe Orientation.
- Responsible for over-viewing the Requirements (SCADA business needs) Traceability Matrix through HP-ALM and maintain a constant vigilance on well-being of project through JIRA, CONFLUENCE in SAFe Orientation and also for the creation and updating of Master CICD Status report consisting of daily project status reports and risks identified for senior managements coordination.
- Responsible for creating EDI MEDI caid use cases according to the mobile technology requirements (SCADA business needs) gathered and accordingly create a traceability matrix via excel or an internal tool like JIRA, CONFLUENCE/RALLY.
- Responsible for preparing plans and coordinating Releases in a CICD environment for business, technical and DEVOPS teams.
- Responsible for being a liason between the business and technical team members & mobile technology requirements to ensure qualitative CICD environment delivery by constantly keeping DEVOPS team posted.
- Responsible for facilitating EDI Focus group analysis with real time users in order to understand their pain points and making sure that the mobile technology requirements (SCADA business needs) are adhering to the problems in terms of better modification in the product and interacting with the SME’s in order to make sure that the newly initiated mobile technology requirements (SCADA business needs) are complying with the legacy requirements (SCADA business needs) and the legacy code of the system.
- Responsible for creating mock ups on EDI MEDI caid and the basis of the outputs of the brainstorming sessions and making sure to inculcate the inputs coming from the technical team and responsible for creating technical acceptance criteria based on the business user stories and business acceptance criteria and the mock ups created on the basis of brainstorming sessions.
- Responsible for creating reports, guidelines and power-point presentations to show the progress within a specific team or over multiple teams and also showing progress in server data repository in a CICD environment through the DEVOPS guidelines.
- Assisted the team in managing and configuring open stack cloud infrastructure in a CICD environment and monitored DEVOPS team with the per day log activities..
- Lead the process of end to end automated build and deployment pipeline across environments, in line with continuous integration and deployment lieu.
- Lead and monitored the implementation of various POCs on Docker containers, and liquidbase.
- Responsible for populating the Validations and Errors tab and making sure that every validation is populated with the reference error code.
- Responsible for overlooking and monitoring EDI MEDI caid software application continuous integration and regression testing cycles and responsible for monitoring and also participating in the development of automated testing tools and continuous integration and regression testing scripts.
- Created ETL Data and its conversions Mapping documents for server data repository; for the developers to create reports in the system by referring to the table names and the UI elements in the Data and its conversions base and making sure they are reflecting on the SUI and ensure CICD environment is satisfied.
- Acted as a Program Manager for the Portfolio teams and made sure that the current velocity of the team is constantly good and all goals and their tasks are being followed up on in SAFe Orientation and for identifying blockers as a Scrum Master and facilitating meeting with MEDI caid third parties or with internal teams, as per necessity, in order to eliminate blockers.
Environment: Scrum, MS Office Suite (Word, PowerPoint, Excel, Outlook), MS Project, Visio, RDBMS, UML, Microsoft Project, Oracle, HPALM, MS Excel, MS Access, SQL Server, JIRA, CONFLUENCE, Java platform, Jenkins Dev ops, Version one Dev ops, SSIS, Javascript, SharePoint, GIT, Docker, Puppet, Bamboo.
Confidential, Texas
Program Manager /Potfolio Manager
Responsibilities:
- Responsible for coordinating and creating Human resource management plan, time allocation management plan in SAFe Orientation and for coordinating with the budget department to ensure that the project is funded for the time allocations recorded and report accordingly to senior management.
- Responsible for working with TO procurement officer to define change orders, scope and project impacts in SAFe Orientation and for conducting elicitations and gathering requirements with multiple clients and then accordingly analyzing and converting high level requirements into business requirements.
- Responsible for working closely with the project team and development procurement coordinator to update the project requirements and for working closely with the impact analyzer to impact the different applications using CICD method within organization and maintain a resource Business use cases for change requests with the DEVOPS teams.
- Interacted with the business and participated in the product backlog grooming meetings in order to prioritize the backlog and for creating the user stories story board on the basis of application impact and release story boards, in order to prioritize user stories per release on the basis of their impact on application.
- Responsible for conducting elicitations and gathering requirements with multiple clients and then accordingly analyzing and converting high level requirements into business requirements and on technical side conducted JAR sessions with focus groups, requirements workshops, Interface analysis and prototyping to effectively understand the analytical reports needed by the internal clients.
- Discussed with the SME’s across different business units to gain solid knowledge of existing EDI Risk Evaluation while concentrating on ROI management and responsible for pulling the top prioritized user stories from the first column into the analysis column on the Kanban board and making sure that the analysis on the tasks starts and is within the WIP limit. Maintaining the CICD fashion of the risk analysis reports through coordination with DEVOPS team.
- Used Mock-up screens to convey the look and feel of GUI screens for the end users to developers and DEVOPS teams. And conducted workflow, Business process diagram and Gap analysis to derive requirements for existing system enhancements using UML within CICD process.
- Responsible for maintaining a central filing system of all the tasks and Business use cases in tools like JIRA, CONFLUENCE & RALLY in a CICD format and also keeping manual exports for general use of business, technical and DEVOPS teams.
- Used Unified Modelling Language (UML) to prepare use case diagrams, Business process flow diagrams, and sequence diagrams using MS Visio to depict the CICD devops flows.
- Responsible for conducting research into application development blockers and testing of the product blockers.
- Extensively interacted with the Technical design and solutions with respect to DEVOPS server data repository, developers to ensure proper guidance and leadership is provided for functional implementation of business requirements and QA Team in executing continuous integration and regression Test Plans, in a TDD, SCADA culture, Test Scenarios, and Test Cases in SAFe Orientation and also coordinated the execution of Unit Testing, System Integration Testing (SIT), Performance & Service level continuous integration and regression testing and User Acceptance Testing (UAT).
- Responsible for creating reports, guidelines and power-point presentations to show the progress within a specific team or over multiple teams.
- Responsible for Code repository maintenance and monitoring DEVOPS teams to complete the related activities.
- Responsible for monitoring and also participating in the development of automated testing tools and testing scripts consisting of cases from server data repository.
Environment: Kanban Agile Business process, Windows (98/XP/7/Vista/8), MS Office Suite (Word, PowerPoint, Excel, Outlook), MS Project, HPALM, Visio, UML, SharePoint 2013, SQL Server Services, Tableau, Cognos, Mock-up Screens, RDBMS, Business processes and monitor Kanban board, JIRA, CONFLUENCE, Java platform, Jenkins Dev ops, Javascript, Version one Dev ops, GIT, Docker, Puppet, Bamboo SharePoint.
Confidential, Conneticut
Program Manager /Agile Coach
Responsibilities:
- Responsible for managing four module teams in SAP (SD, MM, PP, FI, OTC, P2P))ECC - FI, SD, Logistics and MM.
- Responsible for using Asana for SAP (SD, MM, PP, FI, OTC, P2P)) management of four SAP (SD, MM, PP, FI, OTC, P2P))module teams in ECC and EWM. Also constantly keeping all the teams in loop with the latest status updates.
- Responsible for facilitating weekly SAP (SD, MM, PP, FI, OTC, P2P)) module meeting updates with all the SAP (SD, MM, PP, FI, OTC, P2P))functional leads and taking updates on new projects, ongoing projects and future projects.
- Responsible for conducting SAP (SD, MM, PP, FI, OTC, P2P))EDI elicitations and gathering Order to cash requirements with multiple business SAP (SD, MM, PP, FI, OTC, P2P))clients and then accordingly analyzing and converting high level Order to cash requirements into feature requirements.
- Responsible for facilitating the SAP (SD, MM, PP, FI, OTC, P2P))white-board planning sessions with the business to understand the different high level themes and priorities per release in ASAP (SD, MM, PP, FI, OTC, P2P)) AGILE Orientation.
- Responsible for participating in the SAP (SD, MM, PP, FI, OTC, P2P))EDI lock-down sessions to be a scribe for the SAP (SD, MM, PP, FI, OTC, P2P))application teams and create lock-down session notes.
- Responsible for creating an SAP (SD, MM, PP, FI, OTC, P2P))internal to application team repository to maintain a record of all the documents and worksheets being created with respect to the project in ASAP (SD, MM, PP, FI, OTC, P2P)) AGILE Orientation.
- Responsible for creating SAP (SD, MM, PP, FI, OTC, P2P))projects cost justification and cost analysis documentation and coordinating with the VP and CEO to either request launching of a project budgeting or keeping a project on hold.
- Responsible for coordinating with the SAP (SD, MM, PP, FI, OTC, P2P)) retail business and understanding (EDI ) projects timeline and if it fits in the Roadmap of company’s vision to move towards SAP (SD, MM, PP, FI, OTC, P2P))-HANA (POS)(SD, MM, PP, FI, OTC, P2P).
- Responsible for facilitating the prioritization sessions with the SAP (SD, MM, PP, FI, OTC, P2P))application team leads and the business to rank the descriptions of the project and responsible for facilitating Grooming sessions with the SAP (SD, MM, PP, FI, OTC, P2P))application team members in order to go through the prepared EDI user stories and technical acceptance criteria per epic and their respective technical details in Rally tool.
- Responsible for maintaining a SAP (SD, MM, PP, FI, OTC, P2P))EDI central filing system of all the tasks and Business use cases in tools like Asana and also extracting SAP (SD, MM, PP, FI, OTC, P2P))manual exports for general and also for participating in iteration planning sessions with the application team in order to make.
- Responsible for participating in daily PMO stand up meetings with the project managers from Basis and infrastructure teams and gathering statuses per project and directly coordinating with the Director for ECC and EWM applications.
- Responsible for creating SAP (SD, MM, PP, FI, OTC, P2P))EDI reports, guidelines and power-point presentations to show the progress within multiple teams and also responsible for participating in the server allocation meetings.
- Responsible for coordinating with SharePoint documentation approval process and maintaining a log to take approvals from the business once the application SAP (SD, MM, PP, FI, OTC, P2P))functional leads have approved the documentation.
- Responsible for creating SAP (SD, MM, PP, FI, OTC, P2P))EDI transport requests and taking Transport permissions in Asana to coordinate permission requests and move the developed and unit tested objects from SAP (SD, MM, PP, FI, OTC, P2P))Dev client to Q and simultaneously in production in SAP (SD, MM, PP, FI, OTC, P2P)).
- Responsible for going to SAP (SD, MM, PP, FI, OTC, P2P)) Bobs Change Control Board for all the Transports that have been approved and present it to the board for final change permissions. Once the changes are applied communicating it to the CCB approvers through a common email chain.
- Responsible for participating in the regression testing calls for SAP (SD, MM, PP, FI, OTC, P2P))EWM with the lead testing coordinator and tracing continuous integration and regression testing status report.
- Responsible for creating SAP (SD, MM, PP, FI, OTC, P2P))Cut-over plans and facilitating the Cut-over call sessions for both ECC and EWM teams to breakdown the test coordination, in a TDD, SCADA culture in a WBS structure with good risk mitigation and risk issue identification strategy details.
- Responsible for verifying if all the SAP (SD, MM, PP, FI, OTC, P2P))test scenarios, in a TDD, SCADA culture are matching the criteria for the ECC and EWM objects in Asana.
- Responsible for participating/assisting DC SAP (SD, MM, PP, FI, OTC, P2P))EWM demo sessions with the technical team and the business so that the enhanced features can be presented live to the participants.
- Responsible for creating defect reports and resolutions to communicate with the SAP (SD, MM, PP, FI, OTC, P2P))leads.
Environment: Scrum, MS Office Suite (Word, PowerPoint, HPALM, Excel, Outlook), MS Project, RDBMS, Visio, Microsoft Project and dynamic AX, Oracle, MS Excel, MS Access, SQL Server, Java platform, Jenkins Dev ops, Version one Dev ops, GIT, Docker, Puppet, Bamboo, Javascript, oracle finances, AMS.
Confidential, Orlando
Program Manager/Release Coordinator
Responsibilities:
- Responsible for overseeing and updating the Master Project Plan and ensure that plan components are adequately documented and monitor the scheduling and development of the project accordingly and also for creating, reviewing WBS consisting of MSPS standards for all SAFe Oriented project work.
- Responsible for conducting elicitations and gathering web technology requirements with multiple clients and then accordingly analyzing and converting high level web technology requirements into business web technology requirements and also for facilitating the white-board planning sessions with the business and lead project managers to understand the different high level themes and priorities per release in SAFe Orientation.
- Responsible for creating use cases according to the web technology order to cash requirements gathered and accordingly create a traceability matrix via excel or an internal tool like JIRA, CONFLUENCE/RALLY/Confluence and also for being a liason between the business and technical team members & web technology order to cash requirements (ANALYSIS and business needs) to ensure qualitative delivery.
- Responsible for participating in the lock-down sessions to be a scribe for the application team and create lock-down session notes and also responsible for creating an internal to application team repository to maintain a record of all the documents and worksheets being created with respect to the project in SAFe Orientation.
- Responsible for facilitating the prioritization sessions with the application team leads, DEVOPS leads and the business to rank the prepared Epics of the project in a worksheet using top to bottom priority approach and also responsible for facilitating Grooming sessions with the application team members in order to go through the prepared user stories and technical acceptance criteria per epic and their respective technical details in Rally tool.
- Responsible for maintaining a central filing CICD system of all the tasks and Business use cases in tools like JIRA, Confluence & RALLY and also keeping manual exports for general and DEVOPS purpose. Also participating in iteration planning sessions with the application and DEVOPS teams in order to sub-divide the Epics and the corresponding user stories in the upcoming iteration in a CICD fashion and monitoring that every user story has corresponding user story points and tasks attached to the user story in Rally tool.
- Responsible for participating in daily stand up, grooming, sprint planning meetings with the application team members and gathering status per project (within the scope of application team) with the help of rally tool and also Responsible for facilitating the Spike meeting sessions for the application team so that discussion in regards to any ambiguousness on the written Epics and User stories is removed and the expected results are achieved.
- Responsible for creating reports, guidelines and power-point presentations to show the progress within a specific team and in CICD DEVOPS or over multiple teams and also responsible for participating in the server allocation (daily stand up, grooming, sprint planning) meetings and be an observant and scribe for the environment team.
- Responsible for participating in the Test Status calls with the lead testing coordinator and tracing testing status report on the basis of number of continuous integration and regression test cases, in a TDD, SCADA culture and the percentage completed and also responsible for monitoring and also participating in the development of automated testing tools and continuous integration and regression testing scripts in relation server data repository and for monitoring progress with DEVOPS teams.
- Responsible for leading the code repository management using IBM Rational clear case and clear quest Master.
- Responsible for participating/assisting agile demo sessions with the technical team and the business so that the developed application can be presented live to the participants and required verbal approvals are taken per user story.
- Responsible for participating overall defect reporting status calls on server data repository cases and giving defect resolution status to the leadership and also responsible for coordinating with the application Program Manager to estimate the front door projects costs and analytical reports to the leadership about the projects in SAFe Orientation.
Environment: Scrum, MS Office Suite (Word, PowerPoint, Excel, Outlook), MS Project, RDBMS, Visio, Microsoft Project, Oracle, MS Excel, HPALM, MS Access, SSIS, SQL Server, Java platform, Jenkins Dev ops, GIT, Docker, Puppet, Bamboo, Version one Dev ops, Javascript, SharePoint.
Confidential, Baltimore, MD
Program Manager/Program Coordinator
Responsibilities:
- Responsible for coordinating with senior management and the stakeholders to create WBS and ensuring that time allocations for each high level deliverable is documented and scheduled in SAFe Orientation and also for recognizing and updating the MSPS schedule by identifying different impacted MEDI caid applications.
- Responsible for conducting EDI elicitations and gathering requirements (MEDI caid business needs) with multiple clients and then accordingly analyzing and converting high level requirements (MEDI caid business needs) into business requirements (MEDI caid business needs) and for Creating and updating the SCADA EDI Communications plan for all project stakeholders and including the DEVOPS, Business and Technical stakeholders contact lists and distribution structure in order to maintain competence.
- Responsible for creating and updating the SCADA Risk management plan for server data repository in a CICD manner by identifying and prioritizing the risks and monitoring them carefully through to avoid any negative impacts in the project and also for creating government guidelines and policies to adhere with for the project and interact with Senior business analysis team to monitor the project.
- Responsible for interacting with SCADA EDI tech-dev teams and DEVOPS teams and ensuring that server configurations and environments are ready for the project schedule to begin in SAFe Orientation in a CICD environment.
- Responsible for over-viewing the Requirements (SCADA business needs) Traceability Matrix through HP-ALM and maintain a constant vigilance on well-being of project through JIRA, CONFLUENCE in SAFe Orientation and also for the creation and updating of Master Status report consisting of daily project status reports and risks identified for senior managements coordination.
- Responsible for creating SCADA EDI use cases according to the mobile technology requirements gathered and accordingly create a traceability matrix via excel or an internal tool like JIRA, CONFLUENCE/RALLY for monitoring of the CICD process and ensure DEVOPS teams and technical teams are on the same page.
- Responsible for being a liason between the business, technical and DEVOPS team members & mobile technology requirements (SCADA business needs) to ensure qualitative delivery in CICD environment.
- Responsible for facilitating EDI Focus group analysis with real time users in order to understand their pain points and making sure that the mobile technology requirements are adhering to the problems in terms of better modification in the product and interacting with the SME’s in order to make sure that the newly initiated mobile technology requirements are complying with the legacy requirements and the legacy code of the system.
- Responsible for maintaining a central filing system of all the tasks and Business use cases in tools like JIRA, CONFLUENCE & RALLY and also keeping manual exports for general use.
- Responsible for facilitating poker planning (daily stand up, grooming, sprint planning)meetings for the development team Confidential the beginning of every sprint, in order to provide dEDI cated user story hours for a release and for facilitating the Technical design and solutions Spike sessions with the developers and testers and brainstorming ideas according to the business acceptance criteria.
- Responsible for creating mock ups on EDI and the basis of the outputs of the brainstorming sessions and making sure to inculcate the inputs coming from the technical and DEVOPS teams and responsible for creating technical acceptance criteria based on the business user stories and business acceptance criteria and the mock ups created on the basis of brainstorming sessions.
- Responsible for creating SCADA reports, SCADA guidelines and SCADA power-point presentations to show the progress within CICD process for a specific team or over multiple teams and also showing progress in server data repository.
- Responsible for populating the Validations and Errors tab and making sure that every validation is populated with the reference error code for the DEVOPS teams.
- Responsible for overlooking and monitoring EDI software application continuous integration and regression testing cycles and responsible for monitoring and also participating in the development of automated testing tools and continuous integration and regression testing scripts.
- Created SCADA ETL Data and its conversions Mapping documents for server data repository; for the developers and DEVOPS team members to create reports in the system by referring to the table names and the UI elements in the Data and its conversions base and making sure they are reflecting on the SUI in the CICD environment.
- Acted as a Scrum Master for the MEDI caid sprint teams and made sure that the current velocity of the team is constantly good and all goals and their tasks are being followed up on in SAFe Orientation and for identifying blockers as a Scrum Master and facilitating meeting with third parties or with internal teams, as per necessity, in order to eliminate blockers.
Environment: Scrum, MS Office Suite (Word, PowerPoint, Excel, Outlook), HPALM, MS Project, Visio, RDBMS, UML, Microsoft Project, Oracle, MS Excel, MS Access, SQL Server, JIRA, CONFLUENCE, Java platform, Jenkins Dev ops, GIT, Docker, Puppet, Bamboo, Version one Dev ops, SSIS, Javascript, SharePoint.
Confidential, Houston, TX
Program Manager/Portfolio Manager
Responsibilities:
- Obtained and analyzed a detailed knowledge of the business environment for the project in SAFe Orientation and Developed the scope and vision of the primary goals, objectives, scope of project in SAFe Orientation.
- Developed and integrated development lifecycle by integrating rational requisite pro, rational quality manager and ration requirements composer with rational team concert. Also created screen- mock-ups using iRise to review the requirements and provide feedback on the Technical design and solutions.
- Responsible for Data and its conversions validation using SQL queries in MS SQL Server 2008 CICD environment and prepared a detailed Business Requirements Document (BRD) and System and DEVOPS Requirement Specifications and asserted project details in terms of functionality and assumptions and risks.
- Developed AS IS and TO BE analysis using BPMN and DEVOPS standards in SAFe and CICD Orientation and identified and established scope and parameters of requirement analysis in order to define impact, outcome criteria and measure taking actions through interface analysis.
- Used MS Project to manage schedules, deadlines and resources and collaborated on the project and worked with policy or procedure and DEVOPS teams as required to define new/updated CICD policies and procedures.
- Provided post production support/analysis to DEVOPS teams and assisted in performing User Acceptance Testing (UAT), performance testing and validating test plans, in a TDD, SCADA culture, in a CICD fashion in Safe orientation.
- Conducted JAD Sessions with various technical and DEVOPS stakeholders and the project team and analyzed end user problems including automated and manual business processes and identified, researched, investigated, defined and documented business processes in SAFe and CICD Orientation.
- Involved in writing the Business rules which helped the developers for developing the Business logics and made sure the Data and its conversions was stored in a centralized Data and its conversions base for quick access by my team.
- Prepared project deliverables such as Business workflow analysis, Business process analysis, user requirement documents such as Use Cases and managed the requirements using Rational Requisite Pro.
- Followed (SDLC) using Agile Methodology (Scrum framework) and actively contributed throughout the entire Scrum Business process in daily stand-ups, backlog grooming, sprint planning, sprint review and sprint retrospective daily stand up, grooming, sprint planning meetings in SAFe Orientation.
- Involved in Client-side, Server-side and Data and its conversions base validations and prepared Data for DEVOPS team. Did conversions Mapping for better understanding and created Web services for interaction between systems in CICD environment.
- Used UML methodology to prepare Use Cases from the gathered requirements and created diagrams using MS Visio for easy understanding by the technical staff and also used MS Project Professional to manage schedules, deadlines, resources and the project tasks.
- Implemented the continuous integration and regression testing cycle schedules, timelines, test plan, in a TDD, SCADA culture and continuous integration and regression test cases, in a TDD, SCADA culture for system testing, DEVOPS and developed user training manuals.
Environment: Scrum, MS Office Suite (Word, PowerPoint, Excel, Outlook), MS Project, RDBMS, Visio, UML, SharePoint 2013, SQL Server Services, Tableau, Cognos, Mock-up Screens, JIRA, CONFLUENCE, Javascript, HPALM, Java platform, Jenkins Dev ops, Version one Dev ops GIT, Docker, Puppet, Bamboo.
Confidential, Orlando, FL
Agile Program Manager
Responsibilities:
- Responsible for overseeing and updating the WBS Project Plan and plan the documentation and monitoring of the schedule to be implemented. Leading the development of the project accordingly and also for creating, reviewing WBS consisting of MSPS standards for all SAFe Oriented project work.
- Responsible for creating use cases according to the web technology requirements gathered and accordingly create a traceability matrix via excel or an internal tool like JIRA, CONFLUENCE/RALLY/Confluence and also for being a liaison between the business, technical and DEVOPS team members & web technology requirements to ensure qualitative delivery in CICD environment. Most importantly using Microsoft project for the use case description and CICD scheduling.
- Responsible for participating in the lock-down sessions to be a scribe for the application and DEVOPS teams and create lock-down session notes in a SAFe Orientation.
- Responsible for conducting elicitations and gathering web technology requirements with multiple clients and then accordingly analyzing and converting high level web technology requirements into business web technology requirements and DEVOPS CICD requirements.
- Facilitating the white-board planning sessions with the business and leading the project management discussions to prioritize a release.
- Responsible for facilitating the prioritization sessions with the application and DEVOPS team leads and the business to rank the prepared Epics of the project in a worksheet using top to bottom priority approach in CICD environment.
- Responsible for facilitating Grooming sessions with the application and DEVOPS team members in order to go through the prepared user stories and technical acceptance criteria per epic and their respective technical details in Rally tool to accommodate CICD environments.
- Responsible for participating in core budgeting, scope and scheduling sessions with the leaders of the company.
- Responsible for creating cost justification and analytical documentation.
- Responsible for talking to the steering committee and understanding their priorities and matching it with the internal goals of the IT company.
- Responsible for creating the MSPS projects in the MS project scheduler and maintaining the scheduler according to the needs of the project and the changes within a project.
- Responsible for participating in daily stand up, grooming, sprint planning meetings with the application team members and gathering status per project (within the scope of application team) with the help of rally tool and also Responsible for facilitating the Spike meeting sessions for the application team so that discussion in regards to any ambiguousness on the written Epics and User stories is removed and the expected results are achieved.
- Responsible for creating reports, guidelines and power-point presentations to show the progress within a specific team or over multiple teams and also responsible for participating in the server allocation (daily stand up, grooming, sprint planning) meetings and be an observant and scribe for the environment and DEVOPS teams in a CICD environment.
- Responsible for dealing with the HIPAA rules and regulations and maintaining constant company documentation to ensure IT and DEVOPS is functioning according to the compliances.
- Responsible for keeping a flag check within the IT and DEVOPS organization and ensuring that HIPAA and CICD training is being given to the employees and contractors.
- Responsible for facilitating the business, technical and DEVOPS meetings and ensuring the feedback of the application is recorded to maintain the food manufacturing units according to expectation of CICD and Safe orientations.
- Responsible for participating in the Test Status calls with the lead testing coordinator and tracing testing status report on the basis of number of continuous integration and regression test cases, in a TDD, SCADA culture and the percentage completed and also responsible for monitoring and also participating in the development of automated testing tools and continuous integration and regression testing scripts in relation server data repository.
- Responsible for participating/assisting agile demo sessions with the technical team and the business so that the developed application can be presented live to the participants and required verbal approvals are taken per user story.
- Responsible for participating overall defect reporting status calls on server data repository cases with technical and DEVOPS teams and giving defect resolution status to the leadership and also responsible for coordinating with the application Program Manager to estimate the front door projects costs and analytical reports to the leadership about the projects in SAFe CICD Orientation.
Environment: Scrum, MS Office Suite (Word, PowerPoint, Excel, Outlook), MS Project, RDBMS, Visio, Microsoft Project, Oracle, MS Excel, MS Access, SSIS, SQL Server, Java platform, Jenkins Dev ops, Version one Dev ops, HPALM, Javascript, SharePoint GIT, Docker, Puppet, Bamboo.
Confidential
Agile Program coordinator
Responsibilities:
- Worked with different business teams like Prime Services, settlements team to understand the cash projections that they create when they book a trade in SAFe Orientation.
- Developed knowledge of Business process Management (BPM), and cash Management.
- Developed understanding of the Reconciliation of cash flows to understand the scope of the project.
- Developed business requirement documents, use cases, functional and non-functional documents and Business process diagrams including context, Data and its conversions flow and decomposition diagrams.
- Defining the scope of the project and identifying the major actors, using various elicitation techniques to gather requirements
- Responsible for decomposing High Level Business requirement into functional specifications.
- Author Data and its conversions Flow diagrams, Activity diagrams, Sequence diagrams and Business process models with special detail to Sub-Business processes.
- Technical design and solutions message formats, queues, systems interfaces, and worked with the traders though interviews, Questionnaire and JAD sessions.
- Liaise with all the stakeholders Confidential all levels and worked closely with teams of BAs, developers, testers and product control throughout the entire development life cycle to ensure a quality product is delivered.
- Analyze, collected and prepared user requirements definition, scope and expectations for deliverable plans. Delivered system documents, Business processes, diagrams, and test cases, in a TDD, SCADA culture.
- Performed multiple SQL queries using Query Analyzer/TOAD for Data and its conversions Analysis; created Data and its conversions base driven reports with output to MS Excel and custom reports such as SQL file count, Ad-Hoc reports, and monthly migration reports
- Prepared master test plans, in a TDD, SCADA culture with the help of QA team.
- Responsible for conducting the testing and defect analysis.
- Responsible for writing training manuals and training ofthe end
Environment: MS Project, Visual Studio, Crystal Reports, SharePoint, Web Services, MS SQL Server, HTML, XML, JIRA, CONFLUENCE, Java platform, Jenkins Dev ops.