SUMMARY
- Experienced Electrical Engineer, From Federal Polytechnic Nekede, With Over 10 Years Of Cognate Relevant Experience In Industrial Facilities With Electrical, Control And Instrument Installations. On Electrical Construction, Maintenance, Installation And Commissioning Activities.
- Knowledgeable Of TOTAL Maintenance/Construction, Commissioning Methodology And Tools (OPERCOM & ICAPS).
- Knowledgeable Of Chevron Maintenance/Construction, Commissioning Methodology And Tools (ZENATOR).
- Knowledgeable Of Maintenance / Troubleshooting Of Electronic Circuit
- Knowledgeable Of Troubleshooting and operations of (SCHNEIDER ELECTRIC) Panels.
- Preservations Campaign and Verification of Electrical motors, Insulation Resistance and Megger Test
- Experienced With Cable Works, Electrical Power Devices, Bus Bar Installations, MV & HV Applications.
- Familiar With Electrical High Potential Test (HIPOT) Of MV & HV Systems, Cables And Bus Bars For Integrity Assessments.
- Versatile With Power Transformer Installation/Construction And Commissioning (MVA & KVA Rated).
- Experienced With Power And Control Cables Glanding And Termination On Electrical Panels, Junction Boxes Electric Motors Etc.
- Adept With Installation/Construction And Commissioning Activities For Gas Turbine Frame 9e GE, Solar Turbotronics Controls, Transformers, Electric Motors, LV,MV & HV Switchboard, Battery Banks And Uninterruptable Power Supply (UPS) With Battery Chargers.
- Possess Maintenance Capabilities For Emergency Generators, Switchboard Modifications And Troubleshooting.
- Competency For Cathode Protection (Impress Current System And Galvanic) For Pipeline And Other Buried Metallic Structures.
- Proficient User Of Software Applications Which Includes
- Microsoft Office Suite & AUTOCAD.
- Willingness To Learn And Improve
- Excellent Management Skills
- Ability To Work Under Pressure
- Great Team Player
- Direct All Electrical & Instrument Construction Work For Both Control Room, Sub - Station And Field Which Covers Control Panels, Cabinets, Console, Cable Laying, Cable Tray / Ladder & Conduits Works.
- To Direct And Oversee Vendor Shop Repairs On High Voltage Motor And Equipment To Ensure Quality Issue Repairs Reports At The Conclusion Of Critical Jobs For Proper Historical Documentation, Execute Equipment Maintenance Strategies And Perform Other Duties Or Projects As Assigned Within Budgets Averaging.
- Responsible For All Aspects Of Underground Work Including Cable Pulling, Installing Instrument And Threaded Rods, Install (CMS) Trucking, Tray, Ladder Rack Confine Space Entry Small Power And Lighting, Terminating And Gladding, SWA
- Trained And Managed Crew Employees Ensuring Adherence To Safety Procedures And Maintenance Of High Quality Service Standards Expected By Management.
- Diagnose Malfunctioning Systems Equipment And Electrical Parts, Via Using Test To Identify The Cause Of Breakdown, Fix Problems And Connect Wires To Circuit Breakers, Transformers And Others Components Within Designated Schedules.
- Examined Installation And Observed Operations To Ensure Conformance To Design And Equipment Specification, And Provided Technical Assistance To Distribution Equipment And High Voltage Motor/Generators.
- Supervised A Team Of Fifty And More Electrical/Instrument Technician Responsible For Cable Pulling, Tray Installation, High Level Wiring Of Light, Small Power And Lighting Making Of Circuit In This Board Responded And Provided Technical Assistance To Electrical Equipment Problems Within The Company Owned Facilities.
- Planned Drafted, Executed, Maintained And Improved Electrical Instruments Equipment Facilities, Components And System, Controlled Computer Aided Engineering And Designed Equipment To Perform Engineering Tasks.
WORKING EXPERIENCE
Confidential
ELECTRICAL COMMISSIONING
Responsibilities:
- Instrument Air Compressor Package (IR, INGERSOLL RAND)
- Burner Boom
- Pdcs System
- Water Injection Pumps Motor
- Chemical Drain Pump Motors
- Caisson Pumps Motor
- Pig Launcher
- Gas Lift Scrubber
- Cold Vent Header
- 230vac Ups System And Distribution Board
- 24vdc Ups System And Distribution
- Temporary Dissel Generator
- Paga System, Local Area Network System
- Hvac System
- Export Line Rise
- Cd Drum & Pump
- Production Well Slot 81,82,83,84,85,87,89
- Flow Lines Production Well Head Control Panel
- Production Manifold,
- Test Manifold Multiphase Meter,
- Cd Collection Header
- Power Transformer Rated 11kv/400v
- 400 Lv Switch Board
- Heat Tracing Db
- Power Outlet Sockets 400vac / 230vac
- Miscellaneous Cabinet
- Lighting And Small Power Ittr & Etr
- Lighting Circuit, 400/230
- Lighting Transformer
- Methanol Injection,
- Biocide Tanks And Pumps,
- Anti- Scale Injection
- Fresh Water Vessel / Filter/ Pump & Distribution,
- Pedestal Crane,
- Demulsified Tank & Pump,
- Obstruction Light
- Navaids - Light & Foghorns
- Navaids 24vdc Ups System
- Nitrogen Bottle Rack
- Wax Inhibition, Tank & Pumps
- Corrosion Inhibitor Tanks & Pumps
- Earthing Protection Network On The Facilities
- Black Starts With All Their Procedure And O.T.P.
- Preparations For Pre- Commissioning And Commissioning Activities For Work Completion For Handing Over For Start-Up, Troubleshooting And Maintenance Of The Facilities ( SCHNEIDER ELECTRIC, GUTOR BY SCHNEIDER ELECTRIC
Confidential
ELECTRICAL ENGINEER
Responsibilities:
- Qa Qc Activities,
- Icaps
- Constructions Activities
- Rasing And Clearing Punches,
- Loop Test,
- Pre- Commissioning Activities
- Commissioning Activities Etc.
Confidential
ELECTRICAL / INSTRUMENTS SUPERVISOR
Responsibilities:
- Performance Of Site Surveys & Familiarization With Electrical Work Scope For Onshore Preparations And Site Mobilization.
- Preparation Of Construction Deliverables And Site Work Packs.
- Review Of Electrical Construction Materials Specification And Take Off List.
- Support With Materials And Consumables Procurement And Delivery, Including Preservations Prior To Site Installation And Tie-In.
- Perform Pre-Installation Tests For Cables And Electrical Devices For Integrity Assessments Prior To Site Use.
- Assist With Pre-Mobilization Preparations And Arrangements, Including Equipment Selection For Site Works.
- Carry Out Site Construction, Installation, And Supervision Functions Related To Electrical Equipment Installation Completion Activities.
- Provide Support To Interface Teams (Piping Or HVAC Team) During Site Implementation, And Commissioning Activities In Line With The OPERCOM Philosophy For Site Installations.
- Carry Out On-Site Modifications And Documentation Updates Where Applicable, During Site Construction.
- Undertake Skilled Personnel Supervision And Performance Of Construction And Installation Activities For Power Supply, Distribution, And Controls Related To LV/HV Cubicles And UPS/Batteries.
- Carryout Supervision Of E&I Site Team As Lead For Installation Activities In Line With Planning And Work Scope Requirements.
- Support With As-Built Drawings Update And Close Out Documentations
Confidential
SENIOR ELECTRICAL Commissioning Engineer
Responsibilities:
- To Ensure That The Electrical Tests Performed On Worksite By The Contractor And Sub-Contractors Complies With OPERCOM Methodology And Project Procedures.
- To Ensure That All Electrical Safety Pre-Requisites Are In Place Before Performing Any Pre-Commissioning Checks And/Or Commissioning Tests. (PTW And LOTO Procedures).
- To Liaise With Construction Team And Witness All Electrical Pre-Commissioning Activities And Check Sheets Are Filled, Sign Off And Dossier Returned To ICAPS.
- To Check The Progress Of Work Performed By The Contractor And To Ensure That All Risks Are Well Anticipated / Reduced As Much As Possible During Commissioning Activities.
- To Review All Electrical Pre-Commissioning & Commissioning Procedures Prepared By Contractor And Make Relevant Comments In Preparation Of Such Documents.
- To Assess Any Requests By The Contractor To Deviate From Quality Control Procedures Or Technical Requirements And Make Appropriate Recommendation To The Electrical Commissioning Leader. To Participate In Technical Reviews, To Compile Electrical Commissioning Mark-Up Drawings
- To Participate In Weekly And Ad-Hoc Meetings With The Contractor And To Sign All Electrical Functional Test Sheets When The Activity Has Been Completed And Evidence From The ICAPS
- To Ensure That All Electrical Safety Pre-Requisites Are Put In Place Before Performing Any Commissioning Tests And To Ensure That The Quality Of The Electrical Work Performed On Site By The Contractor And Subcontractors Is In Compliance With Contract Requirements And Project Procedures.
- Supervise All Electrical Installations, Conformity Checks, Functional Tests And Operational Tests Assigned By Site Team Lead.
- Review, Propose And Effect Technical Changes Or Modification On Electrical Equipment Where Applicable.
- Reporting Functions, Including Compilation And Closure Follow-Up Of All Electrical Punch List Items.
- Provide Support To Other Supervisors (Mech/Piping/Instrument/HVAC/Telecom) As Required.
Confidential
ELECTRICAL / INSTRUMENT ENGINEER.
Responsibilities:
- Visual Inspection Of Worksite Equipment/Tools, Ie Carefully Walk Round
- Carefully Walk Round The Area For Familiarization Purposes.
- Conduct Toolbox Meeting. Where All Safety And Operation Aspects Of Work Shall Be Fully Discussed In Order To Identify All Hazard Associated With The Works And Control Measures Put In Place.
- Cold Work PTW Shall Be Raised And Endorsed/Revalidated Prior To The Commencement Of Work.
- Carry Out Daily Pre- Use Inspection Check On All Equipment And Tools To Ensure They Are Fit For Purpose (In Good Conditions) Priority To Use.
- Ensure All Personnel Are Competent And Medically Fit For The Day's Job.
- Testing Of Cables On Drums.
- Ensure Validity Of Testing Instrument /Equipment.
- Hazard Identification (Inspect Cables And Areas For Known Hazard Source)
- Cut And Peel Cables To Expose Conductor /Copper Strands.
- Carry Out Continuity Testing And Insulating Resistance Testing On Cables And Record Readings.
- Dress And Tape Cables Ends Neatly After Testing.
- Pulling And Laying Of Cables Along Excavated Trench.
- Ensure Validity Of Probe Device.
- Probe The Area Prior To Excavation.
- Prior To Cable Pulling And Laying, Ensure The Excavated Trench Is Well Dressed.
- Install Cable Drum On Cable Stand.
- Pull And Lay Cables Through Trench And Cable Tray From Jbs In The Manifold Area To The Wellhead Area.
- Position Concrete Cable Slab Over The Laid Cables And Backfill Trench.
- Install Cable Route Markers On The Back Filled Trench In Accordance With Standard Construction Specification.
- Installation Of Cable Tray / Instrument Devices.
- Prepare Concrete Bases With Hold - Down Bolts For Cable Tray Support.
- Installation Of Cable Tray/Racks On Its Supports.
- Installation Of Instrument Devices (Break Glass, Temperature And Pressure Gauges/ Transmitters, Sand Detectors Probe Transmitter, Manual And Automatic Choke Valves, PAS, SIS And F&G Junction Boxes).
- Commence Testing Of Instrument Cables Of Continuity And Insulation Resistance (Meggering) Were Necessary.
- Glanding And Termination Of Cables
- Gland And Terminate Cable Junction Boxes, Transmitters And Wellhead Control Panel.
- Carry Out Testing Of Cables (Insulation And Continuity).
- Installation /Termination Will Be Carried Out With Appropriate Cable Glands And Shrouds In Accordance With The Cable Schedule And Termination Drawing In AFC Package.
- Fiber Optic Cable Termination By The Vendor Specification.
- Hazard Identification (Inspect Cables And Area To Be Earthed For Known Hazard Source).
- Cut And Peel Earth Cable To Expose Conductor.
- Install Earth Log And Terminate At Appropriate Points On All (Junction Boxes, Cable Tray And Instrument Devices And Support).
- Ensure All Earthen System Are Adequately Grounded And Bonded/Connected To Plant Earth In Accordance With Construction Standard Specification - 17.
- Re -Instate Or Restore The Entire Site As Much As Possible To What It Was When Arrived.
- Proper Housekeeping.
Confidential
ELECTRICAL ENGINEER
Responsibilities:
- Prepare Electrical Drawing And Specifications
- Manage Project Schedules And Budgets, And Obtain Permits For Operations
- Make Engineering Calculation In Connection With Field And Office Assignment.
- Investigate Problems And Recommend Solutions
- Ensure Compliance With Safety Requirements And Standards Procedures
- Prepare Requests For Proposals And Evaluate Bids
- Estimate Cash Flow Projections
- Perform Highly Specialized Design, Research And Analysis On A Project By Project Basis And Advise On Code Compliance.
- Review And Update Of Project Electrical Engineering Documents
- Installation And Commissioning Of ALSTORM Gas Turbine(GT13E2 180MW)
- Ensure Compliance Of Design Implementation And Performance Of Modifications Where Required
- Supervision Of Low (LV), Medium (MV), And High Voltage (HV) Cable Pulling Activities On Site,
- Supervision Of Cable Glanding And Termination For Low Voltage, Medium Voltage, And High Voltage
- Cables To Switchgears, Junction Boxes, And Pump Motors.
- Coordinate Testing And Commissioning Activities On Site.
- Involved With Installation Of Field Equipment And E&I Junction Boxes
- Involved With Installation Of Acoustic Lightings, Flood Lights And Emergency Lighting.
- Performed Dielectric Test For Power Transformer Oil With Other Integrity Tests As Required
Confidential
ELECTRICAL ENGINEER
Responsibilities:
- Installation Of Supports, Junction Boxes And Cable Trays
- Pulling And Tagging Of Cables
- Gland And Termination Of Cable
- Maintenance Of GE Switchgears And MCC Motor Starter.
- Trouble Shooting Of Uninterruptable Power Supply System (20KVAUPS).
- Maintenance Of Electric Motors For Skimmer Tank, Floatation Cell And Water Injection Pumps, And Source Well Pumps Etc.
- Installation Of 350KVA Transformer And Maintenance.
- Maintenance And Installation Of Emergency Generators.
- Fabrication And Installation Of Electrical Panels.
Confidential
ELECTRICAL ENGINEER
Responsibilities:
- Performed Highly Specialized Design, Research, And Analysis On A Project By Project Basis.
- Provided Advice Regarding Code Compliance
- Created And Presented Economic Feasibility Studies
- Performed Quality With Other Department Outside Agencies, Contractors And Consultants
- Directed, Prepared, Reviewed And Approved Contract Documents And Specifications, Making Modifications And Recommending Alternatives As Needed.
- Exercised Cost Control, Monitored Schedules, And Investigated Problems.
Confidential
ELECTRICAL ENGINEER
Responsibilities:
- Prepared And Reviewed Engineering Plans Specification, Project Schedules, Designs, Circuit Diagrams, And Estimates For Construction And Maintained Of Power Generation Projects.
- Planned And Estimated Cost On Projects
- Provided Technical Support For System Operation And Maintenance.
- Maintained Effective Working Relationships With Field Crews Contractors, Vendors Outside Agencies The Public And City Staff Members.